Energy equipment · Steam, hot water, power & plant integration
Used Steam Boilers, Steam Turbines & CHP Plants for Sale
Find used steam boilers, steam turbine-generator packages, CHP plant equipment and industrial hot-water boilers for purchase and project evaluation. Compare the documented duties, request a price and technical file, and define the inspection, dismantling, packing and export scope for your project.
Review the technical details for each offer and use its equipment reference when enquiring. The Omnical boiler is a component of the CHP package, so the two references describe the same plant at different levels of scope.
Back-pressure turbine-generator package with Siemens generator and Renk TB-800 gearbox. A compatible high-pressure steam source is assessed separately.
Standardkessel HD 0601-12 boiler with two Weishaupt dual-fuel burners and a documented economizer. Original manual, drawings and photographs are available for review.
Illustrative rendering. Configuration subject to confirmation; not a photograph or dimensional drawing of the offered unit.
Industrial hot water · Natural gas · 1993
Viessmann Paromat-Triplex Hot-Water Boiler
Equipment reference: MR-HW-1400
A steel heating boiler with a Weishaupt Monarch gas burner for industrial hot-water applications. Technical documentation and historical service records are available for review.
1,400 kW (1.4 MW); original documented output range 1,220–1,400 kW
Installed fuel
Natural gas
Burner
Weishaupt Monarch G7/1 series; year 1993. Exact variant to be confirmed.
Original documented boiler limits
6 bar maximum permissible pressure / 120°C maximum permissible flow temperature. These are historical boiler limits, not confirmed current operating settings.
Dimensions / transport weight
To be confirmed for lifting and transport planning
Available records
Original technical documentation, 2022–2023 burner service records and 2023–2024 chimney inspection records
Supply scope / inspection
Boiler, burner and any auxiliaries to be agreed in the quotation. Current condition and inspection arrangements subject to confirmation.
Document review: The original installation sheet and 2022 service report identify a 1,400 kW unit. Later inspection records contain different model/rating entries. The nameplate, current operating limits and safety components require technical review before purchase and recommissioning.
For a useful quotation, include your required water temperature, system pressure, fuel supply, destination and project timing. Maria Roboter can define the dismantling, packing, export and integration scope for your project.
Compact back-pressure turbine-generator package for evaluating power recovery from an industrial steam system, with original technical drawings and photographs.
Documented output: 265 kWType: Back-pressureTurbine model: ETT FT5
Inlet pressure differs between datasheet and nameplate; verify the operating limits during technical review.
Off-market equipment opportunities. Current availability, condition, inspection access and final supply boundaries are confirmed before purchase. Supplied photographs document the equipment; they do not establish its present operating status.
Compare the documented duties
Turbine power, boiler duty and steam capacity describe different quantities. Use this overview to shortlist equipment, then review the detailed specifications and your receiving-site requirements.
Define the required inspection, dismantling, match-marking, packing, export and installation support for the equipment concerned.
Questions about used energy equipment
Which used energy equipment is listed?
The section lists a Siemens SST-300 turbine-generator package, a 1 MW CHP plant package, its Omnical boiler component, a Standardkessel 20 t/h gas/oil boiler, a Viessmann Paromat-Triplex hot-water boiler with a documented 1,400 kW rating, and an ETT 265 kW back-pressure turbine-generator. The Omnical boiler reference is part of the CHP plant rather than an additional independent plant.
How do I choose a suitable steam turbine?
Compare available steam pressure, temperature and flow with the turbine requirements, then assess exhaust/process-steam demand, electrical connection and operating profile. A project-specific steam balance and integration review establish the technical fit.
Do the turbine packages include a boiler?
The Siemens documentation covers a turbine-generator package and requires a suitable steam source to be assessed separately. The 1 MW CHP documentation includes a boiler and plant auxiliaries. The ETT offer is a turbine-generator package. Confirm the final supply list for the selected reference.
Can I request the CHP boiler as a separate component?
The Omnical boiler is a component of CHP package MR00052. Separate supply is discussed on request and depends on confirmation of the agreed plant and component scope.
How is current condition and availability verified?
Request the latest condition information, available records and inspection arrangements for the chosen reference. Current availability, inspection access and final supply boundaries are subject to confirmation and prior sale.
Can Maria Roboter support dismantling, export and integration?
Maria Roboter can define an equipment-specific scope for technical review, dismantling and match-marking, packing and export logistics. Receiving-site installation and integration support can be discussed for the project.
Buying a used industrial boiler: the project brief
Start with the duty your plant actually needs. Specify steam production in t/h or hot-water heating duty in kW, and state the required pressure and temperature. A hot-water boiler is not a substitute for a steam generator. Keep permissible design limits separate from the operating conditions needed by your process.
Match the fuel and supply boundaries
Record the available fuel and supply conditions. The Standardkessel listing documents gas/oil firing, while the Omnical component documents a lignite-dust system. Do not assume that a different burner or a fuel conversion is included. Identify the boiler, burners, economizer, water treatment, feedwater equipment, controls and safety devices required in your quotation.
Request evidence before planning relocation
Ask for the nameplate, technical file, drawings, operating records and inspection access. Historical reports describe past inspections; they do not establish current certification or permission to operate at a new site. Confirm current condition, shipping dimensions, lifting weights and destination requirements before agreeing the removal and transport plan.
Send one concise enquiry
Include your required duty, operating pressure and temperature, fuel, destination country and target installation date. State whether you need equipment only or a defined scope for dismantling, packing, export and receiving-site support.
Buying a used back-pressure turbine: the compatibility brief
Shortlist a turbine using the steam network, not the headline power figure alone. Provide inlet pressure, temperature and available flow, together with the process-steam pressure and demand downstream. State whether each pressure is absolute, bar(a), or gauge, bar(g).
Check the complete operating envelope
Compare the documented normal and maximum conditions with your intended operation. For the Siemens SST-300 listing, the two turbine ratings refer to different stated conditions; they are not a promise of net plant export. For the ETT listing, the inlet-pressure discrepancy between the datasheet and nameplate must be resolved before accepting an operating limit.
Separate turbine, generator and boiler scope
Review generator voltage, frequency, apparent power, power factor, protection, synchronization and the receiving electrical network with the project engineer. A turbine-generator listing does not automatically include a boiler. The Siemens and ETT opportunities require review of the steam source; the MR00052 CHP file also describes associated boiler and plant equipment, with the final supply boundary agreed separately.
Prepare the quotation request
Send the required power, steam inlet conditions and flow, exhaust/process-steam demand, site voltage/frequency, destination country and schedule. Request the technical file, current inspection arrangements and an itemized scope before ordering.