Energy equipment · Steam, power & plant integration

Used Industrial Energy Equipment

Explore documented used steam turbines, turbine-generator packages and industrial steam boilers. Compare the main duties, review each technical page and request the equipment file for your project.

Equipment opportunities

Each offer has a dedicated technical page and enquiry form. The Omnical boiler is a component of the CHP package, so the two references describe the same plant at different levels of scope.

Original installed Siemens SST-300 steam turbine, steam pipework and auxiliaries
Supplied equipment photograph.
Steam turbine-generator package · 2018

Siemens SST-300 Steam Turbine Package

Equipment reference: MR00040

Back-pressure turbine-generator package with Siemens generator and Renk TB-800 gearbox. A compatible high-pressure steam source is assessed separately.

Turbine output: 19.47 / 22.90 MWSteam flow: 125 t/hInlet: 114 / 126 bar(a)

Normal / maximum ratings. Boiler is outside the documented turbine-generator scope.

Installed 1 MW steam turbine generator package
Supplied equipment photograph.
CHP plant package · 2007

1 MW CHP & Steam Turbine Package

Equipment reference: MR00038

Documented CHP plant combining a 1 MW back-pressure turbine-generator with a 10 MW boiler producing 14.5 t/h steam, plus associated plant auxiliaries.

Turbine output: 1 MWBoiler steam: 14.5 t/hLive steam: 23.5 bar(g) / 400°C

Lignite-dust fuel system and plant supply boundaries require an equipment-specific review.

Installed Omnical steam boiler forming part of the CHP plant
Supplied equipment photograph.
Boiler within CHP package · 2007

Omnical Industrial Steam Boiler

Equipment reference: MR00038-B

Boiler component of the MR00038 CHP plant. The documented boiler duty is 10 MW with 14.5 t/h steam generation and a lignite-dust firing system.

Boiler duty: 10 MWSteam generation: 14.5 t/hLive steam: 23.5 bar(g) / 400°C

Part of MR00038. Separate supply scope is available for discussion and must be confirmed.

Standardkessel 20 t/h gas and oil steam boiler in installed condition, with burner and gas pipework
Supplied equipment photograph.
Gas / oil steam boiler · 1996

Standardkessel 20 t/h Dual-Fuel Steam Boiler

Equipment reference: MR00050

Standardkessel HD 0601-12 boiler with two Weishaupt dual-fuel burners and a documented economizer. Original manual, drawings and photographs are available for review.

Steam capacity: 20 t/hPermissible pressure: 13 bar(g)Fuel: Natural gas / light fuel oil

Water treatment, deaerator, controls and remaining auxiliaries are confirmed in the final supply scope.

ETT FT5 steam turbine in installed condition
Supplied equipment photograph.
Smaller back-pressure turbine · 2003

ETT FT5 + G280 Steam Turbine Generator

Equipment reference: MR00051

Compact back-pressure turbine-generator package for evaluating power recovery from an industrial steam system, with original technical drawings and photographs.

Documented output: 265 kWType: Back-pressureTurbine model: ETT FT5

Inlet pressure differs between datasheet and nameplate; verify the operating limits during technical review.

Off-market equipment opportunities. Current availability, condition, inspection access and final supply boundaries are confirmed before purchase. Supplied photographs document the equipment; they do not establish its present operating status.

Compare the documented duties

Turbine power, boiler duty and steam capacity describe different quantities. Use this overview to shortlist equipment, then review the detailed specifications and your receiving-site requirements.

Equipment / referenceYearDocumented ratingSteam pressureSupply scope
Siemens SST-300 Steam Turbine Package
MR00040
201819.47 / 22.90 MW114 / 126 bar(a)Turbine-generator; separate steam source
1 MW CHP & Steam Turbine Package
MR00038
20071 MW turbine / 14.5 t/h steam23.5 bar(g)CHP package; scope to be confirmed
Omnical Industrial Steam Boiler
MR00038-B
200710 MW / 14.5 t/h23.5 bar(g)Component of MR00038; not an extra plant
Standardkessel 20 t/h Dual-Fuel Steam Boiler
MR00050
199620 t/h steam13 bar(g) permissibleBoiler, burners, economizer; auxiliaries to agree
ETT FT5 + G280 Steam Turbine Generator
MR00051
2003265 kWDatasheet / nameplate verification requiredTurbine-generator package

bar(a) = absolute pressure. bar(g) = gauge pressure. Siemens output and inlet values are normal / maximum documented conditions.

From equipment selection to receiving-site integration

1. Define the duty

Share your required power or steam capacity, inlet conditions, process-steam demand, country and intended schedule.

2. Review the technical fit

Check documents, condition, supply boundaries, auxiliaries, utilities, emissions and receiving-site interfaces.

3. Agree the project scope

Define the required inspection, dismantling, match-marking, packing, export and installation support for the equipment concerned.

Questions about used energy equipment

Which used energy equipment is listed?

The section lists a Siemens SST-300 turbine-generator package, a 1 MW CHP plant package, its Omnical boiler component, a Standardkessel 20 t/h gas/oil boiler and an ETT 265 kW back-pressure turbine-generator. The Omnical boiler reference is part of the CHP plant rather than an additional independent plant.

How do I choose a suitable steam turbine?

Compare available steam pressure, temperature and flow with the turbine requirements, then assess exhaust/process-steam demand, electrical connection and operating profile. A project-specific steam balance and integration review establish the technical fit.

Do the turbine packages include a boiler?

The Siemens documentation covers a turbine-generator package and requires a suitable steam source to be assessed separately. The 1 MW CHP documentation includes a boiler and plant auxiliaries. The ETT offer is a turbine-generator package. Confirm the final supply list for the selected reference.

Can I request the CHP boiler as a separate component?

MR00038-B identifies the Omnical boiler within CHP package MR00038. Separate supply is discussed on request and depends on confirmation of the agreed plant and component scope.

How is current condition and availability verified?

Request the latest condition information, available records and inspection arrangements for the chosen reference. Current availability, inspection access and final supply boundaries are subject to confirmation and prior sale.

Can Maria Roboter support dismantling, export and integration?

Maria Roboter can define an equipment-specific scope for technical review, dismantling and match-marking, packing and export logistics. Receiving-site installation and integration support can be discussed for the project.

Discuss your energy equipment requirement

Choose a documented offer or ask us to help you select one. The selection and page link are included in your enquiry automatically.

In the message below, include the required duty, available steam conditions, destination country and installation schedule.